SERVICES: 
ENGINEERING PROTOTYPES
ENGINEERING ARTWORKS
SITE MAP
SUSTAINABLE LIVING
 
PRODUCTS:
LEVITATION KIT
FURNITURE
ELECTRONIC ARTWORK
THERMAL WINDOWS
 
SOLAR INFO:
SOLAR POWER
SOLAR HEATING
SOLAR HOT WATER
SOLAR MOWER
 
RESOURCES:
ABOUT ME
IN THE MEDIA
BUILDING A CANOE
WIND STUDY
 
CONTACT

home > canoe

Building a Sassafras 14 ft. stitched lapstrake canoe
Bookmark and Share

HOME 1. laying out
the planks
2. cutting
planks
3. gluing
planks
4. rabbeting
edges
5. stitching
seams
6. shaping
hull
7. filleting
stems
8. gluing
seams
9. removing
stitches
10. filling
holes
11. gluing
inwhales
12. gluing
outwhales
13. glassing
outside
14. glassing inside 15. glassing
keel
16. decks and
seat mounts
17. installing
seats
18. epoxy
coat
19. sanding 20. varnishing 21. finishing up 22. launching storage BILL OF
MATERIALS
This canoe was built from plans in the book "The Canoe Shop"

September 10, 2007
Installing thwart and seats

Today I installed the thwart and seats.  When I bought the seat hanging hardware, I remembered that the picture of the parts kit that you can buy in a marine supply store showed plastic bolt covers, so I found some of those in addition to all the bronze hardware at my local ACE hardware store.  It's a nice finishing touch.
The weather is too gray and it is raining so I will not be able to put her in the water for another few days, but I can sit in her and imagine!

next >>


visits since 10/10/07
Hit Counter